Bauwerk has invested in the St.Margrethen site

The summer holidays represented a busy period. Great work has been accomplished at two construction sites.

New hot air dryer

The plans to extend the production line for surface finishing started over a year ago. The existing plant has been extended by 20 metres and is now 65 metres long.

During the annual shutdown in the summer, the in-house mechanics and electricians converted the plant in just three weeks.

The most important part of the new surface finishing line is the multistage dryer. All the natural oiled products and parquet treated with the new B-protect surface are dried for 20-30 minutes in warm circulating air.

The advantage of the new plant is its faster turnaround time. The plant also facilitates new production possibilities which strengthens Bauwerk's position as an innovator. One million Swiss francs has been invested in this project.

For even more exhibition space

A spacious and inspiring atmosphere: the newly designed Parquet World at St. Margrethen is very welcoming. The divide to the former "emotion room" has been opened up and is now part of the exhibition...this Parquet World now has a more open and inviting allure. All the floor areas have also been refitted with current products.